Skip to content

Razorback Approach — FSM

  • Departures: Tower must provide a rolling report for all IFR departures to the radar controller above them, unless coordinated otherwise.
  • Arrivals: Radar must instruct VFR arrivals to contact the appropriate Tower. Towers must sequence VFR arrivals and pattern traffic with IFR traffic.

  • Departure procedures in the FYV area are radar vector procedures — not usable below radar coverage.
  • For departure separation, assign parallel or diverging headings.